The construction of the three-dimensionally shaped pylons higher than 400 m requires a very high technological degree. It is known that the application of the tapered slip form method for the erection of the concrete pylon of long-span cable bridges offers the advantage of being significantly faster than applying the auto-climbing system (ACS) form method. Therefore, this study presents the development of an innovative slip form system for pylons with tapered cross-section. Surface wave inspection system is applied for the determination of slip-up time, wireless hydraulic control system is applied for auto rising, GPS system is used to manage the pylon configuration, and lightweight GFRP (Grass Fiber Reinforced Plastic) panels are applied in the slip form system. Small-scale tests were conducted three times to validate the performance of the developed core technologies, and full-scale tests were conducted twice to validate and verify the developed innovative slip form. The full-scale tapered concrete pylons have hollow shafts and a height of 10 m. The sectional dimensions are varied according to the construction height. The experimental constructions of the tapered pylons using the innovative slip form were conducted successfully. This system is the world’s first application of GFRP slip form panel.
The moving form systems mostly adopted for the erection of the concrete pylons of super long-span bridges are the ACS (Auto Climbing form System) and the slip form system, which differ in their operational methods. Slip forming places concrete continuously by lifting vertically the form panels and yoke leg geared with a vertical jack attached to a rod embedded in the concrete mass. Since slip forming proceeds through the repetition of 5 simultaneous tasks including the assemblage of form, the assemblage of reinforcement, the placing of concrete, the curing and the removal of form, this method presents the advantage of shortening significantly the construction period compared to other methods even when considering the periods devoted to the installation and dismantlement. Especially, slip forming is at least twice faster than the ACS method by placing a height of concrete of 2 to 4 m per day. It also provides high quality and monolithic construction thanks to the continuous placing without construction joint. Therefore, slip forming enables to minimize the occurrence of micro-cracks that can be frequently observed in common concrete structures.
The tapered slip form system is mainly applied for the erection of high pylons necessitating extremely com- plex construction technology since the cross section varies with respect to the height and the shape of the pylon changes three-dimensionally. It is generally applied in the erection of the high pylons of super long-span bridges like cable stayed bridges and suspension bridges. However, despite of the vast experience gathered in the nu- merous long-span bridge construction sites in Korea, the design, fabrication and operation of the tapered slip form system are still completely relying on several foreign specialized companies, which let us use a subordi- nate technology resulting in tremendous outflow of foreign currency for the erection of high pylons. According- ly, the acquisition of the self-reliant and domestic tapered slip form system integrating automation technology will contribute to our competitiveness in winning foreign construction projects as well as prevent the outflow of our national wealth [
In this research, efforts were endeavored to contribute to the modularization and weight reduction of the sys- tem so as to ease the assemblage, installation and dismantlement of the components of the slip form system. By integrating the automated system operation technology and the accurate high pylon configuration control tech- nology, the construction period can be drastically shortened. The developed tapered slip form system provides an advanced system also securing easy quality control. A series of 3 mockup tests of the slip form system veri- fied the performance of each individual core technology, and a series of two public validation tests enabled to verify and improve the performance of the developed system.
The tapered slip form system developed in this research (
automation technology, and the slip form positioning and high pylon configuration control technology (
In view of its scale and symbolism, the pylon is the most distinctive structure among the components of the super long span-bridge. Accordingly, the localization of the design and fabrication technology of the tapered slip form system, known as the latest erection method of the pylon, can be considered as a critical factor in term of the establishment of the self-reliant construction of super long span-bridge.
This research developed the design and fabrication technology of the slip form system enabling to cope with the tapered configuration of the cross section varying from the base of the pylon to its top. First, the height and shape of the pylon were determined and, the preliminary design of the components of the slip form system was conducted considering the adaptation to the tapered shape. Thereafter, the structural stability of the slip form system was verified using the commercial program Midas prior to the detailed design and drawings of the details. Moreover, the design results were examined visually by BIM to minimize the construction errors induced by the two-dimensional drawings. The virtual assemblage and construction enabled to verify in advance the practicability of the developed slip form system (
The traditional steel form relies on manpower and equipment for the assemblage, dismantlement and transport of the members. This means that long time is spent for the assemblage and dismantlement. In addition, very costly crane equipment must be mobilized because of the weight of the steel form. In order to solve these prob-
Core technology of slip form system | Previous technology | Technology developed in this study | |
---|---|---|---|
Design of tapered slip form system | Design of tapered slip form system (existing technology) | Improved design of tapered slip form system (application of BIM technology) | |
Lightweight tapered slip form system | Steel form | Modular GFRP form | |
Automation of tapered slip form system | Determination of slip-up time | Traditional method using probing rod | Quantitative method applying surface wave inspection system |
Hydraulic system | Manual hydraulic control | Automated wireless hydraulic control | |
Spindle control | Manpowered | Automated electro-motor | |
Erection accuracy control | Electro-optical wave station, plumb laser | Wireless remote verticality control (GPS, inclinometer, image-transmitting plumb laser) |
lems, modular lightweight GFRP forms were developed for the first time in the world and applied to the slip form system. The GFRP form plays not only the role of form for the placing of concrete but also contributes structurally as a tension stiffener in the whole system. Furthermore, the steel form is vulnerable to damages caused by salt attack in marine environment, which induces increased costs for the quality control of the system. Besides, the GFRP form can supplement this disadvantage and can secure stable quality of concrete owing to its insulating capacity in winter [
If such modular GFRP form is applied as component of the slip form system (
The slip-up of the slip form system shall be executed at the time at which concrete becomes able to be self- supported when removing the form and to develop sufficient strength in a long term. Slip-up shall also be conducted before the bond between concrete and the form becomes so strong that excessive jacking force is required to lift the form.
The technique using surface wave velocity exploits the characteristics of the surface wave propagating along the surface. The variation of the surface wave velocity indicates the extent of hardening of concrete. This research measures the extent of hardening of concrete using the surface wave velocity. This quantitative measurement enables to determine the optimal slip-up time of the slip form. Therefore, an ultrasonic module (
The slip-up of the slip form system is done by means of hydraulic jacks along a rod embedded in the concrete mass. The erection of the concrete pylon mobilizes dozens of hydraulic jacks. Attention should thus be paid to avoid the occurrence of eccentricity during the slip-up. Therefore, each hydraulic jack must be controlled appropriately. This research developed an automated hydraulic system enabling to execute accurately the lifting and descent of the hydraulic jacks. This system linked to a control PC in a remote control room makes it possible to control wirelessly the hydraulic jacks and achieve more accurate configuration control.
The tapering of the slip form system is executed by means of a mechanical device called spindle. The rotation of the spindle was performed by the technician operating the slip form system using a spanner fabricated to fit with the size of the spindle. This means that the tapering of the slip form system must be completed within the
time during which the technician can rotate the spindles. If the spindles cannot be rotated within this time, the tapering of the slip form system cannot be done. Recalling that, to date, the spindle rotation task was conducted individually by manpower, the adoption of an electro-motor eases the task and allows individual as well as simultaneous control (
In order to realize the accurate erection of the concrete pylon, the need is to prepare a database collecting the observation related to the environmental factors around the bridge site together with the corresponding responses of the structure. Especially, during the slip forming of high pylon, the eccentric loading caused by the reinforcement waiting for assemblage at the top of the slip form may deform the form, and differential displacement of the form may occur due to partial lifting. Accordingly, this research developed the KICT Integrated Configuration control System (KICS) for the shape control and position correction of the slip form so as to minimize the effects of climate and 3-dimensional tapered cross section (
A series of 3 mockup tests were conducted to test the performances of the core technologies developed in this research (
The second mockup test examined the performance of the surface wave analysis system. And, the third mockup test focused on the performance of the lightweight GFRP panels. Moreover, a series of two public validation tests were conducted using a prototype of the tapered slip form system to verify the performance of the developed system.
The first public validation test intended to verify the performance of the developed core technologies. The test constructed a tapered concrete pylon of 10 m exhibiting a rectangular cross section varying from 4.0 m × 4.0 m at the base to 3.77 m × 3.6 m at the top (
In the second public validation test, the erection was executed considering the actual conditions of a pylon site including the installation of the cable anchorage during construction. The two legs of the pylon were erected simultaneously using a latticed girder. The test constructed the two legs of a tapered concrete pylon exhibiting rectangular cross sections with dimensions varying from 4.0 m × 4.0 m at the base to 4.0 m × 3.6 m at the top (
A series of public validation tests demonstrated that the tapered concrete pylon could be successfully erected by means of the slip form system developed in this study. By integrating the latest IT technology for the design, automated operation and configuration control, the developed tapered slip form system secures outstanding quality of concrete and faster construction than foreign technology. This research offered the opportunity to acquire design technology for the tapered section of the slip form system as well as the management technology for erection accuracy. GFRP panels were applied for the first time in the world. The technique determining the slip-up time of the slip form using surface wave, the wireless hydraulic control technique and the electromotive spindle control technique were developed to realize the automated operation technology of the system.
Requests for license agreement and new excellent technology are currently introduced. In the future, the efficiency of the tapered slip form system in adapting to various site conditions will be demonstrated through its application in real bridge construction sites so as to achieve the self-reliant and complete erection of the pylons of super long-span bridges. Apart from bridge’s pylons, this tapered slip form system technology will find application for the construction of wider types of elevated structure projects like the chimneys of thermoelectric power plants and wind power towers.
Since the fundamental technologies related to this innovative tapered slip form system have been acquired, the Korean construction industry can now secure an unrivaled competitiveness in the foreign super long-span bridge market, which will provide a platform for winning overseas bridge projects.
This paper was supported by the “Development of Accelerated Construction Technologies for High Pylons” project of the Super Long-Span Bridge R&D Program. The authors express their gratitude for the support.