Dumping areas represent a stable hazard. To clarify the formation mechanism of dumping piles on dumping area stability, an investigation in open pit mine was performed. Moreover, experiments with gravel were conducted based on the research site conditions. The geological conditions, dumping operation, and waste particle size distribution were investigated in the Heidaigou open pit mine. Particle size distribution, dumping height, dumping volume, and floor inclination were varied to examine their effects on a single pile formation. The design of blasting can be modified to make the particle size of waste smaller. The volume of the bucket does not have a pronounced effect on dumping pile repose angle, capacity of dumping pile, and dumping area stability. The smaller the floor inclination, the better it is. Two measures are proposed to increase the kinetic force of friction between waste material and floor surface. The interval distance, dumping volume and dumping height were also varied to examine the interaction between the formations of multiple piles. The dumping width should be decided through optimization efficiency of bulldozer and dumping device in bucket wheel excavator-belt-stacker dumping operation and dragline dumping operation. Moreover, the volume of the bucket does not have a pronounced interaction effect. In the dumping operation, the work amount of bulldozer decreases as dumping pile increases. The design of the dumping operation must consider the total efficiency of ground leveling operation and forming dumping the area.
Dumping work is an important component of open pit mining [
In 1978, China initiated reforms and opening-up policies. Moreover, in 1986, the first internal dumping area was founded in the Yimabei open pit mine. In 1987, the first large-scale Antaibao open pit mine was established in Shuozhou City, Shanxi province. Subsequently, many large-scale open pit mines were established (
After 2002, heavy industry growth became obvious in China. Coal output increased from 1.72 to 3.24 billion tons from 2003 to 2010 [
Currently, high slopes and large-scale dumping areas are formed and will be formed. Slope and dumping area stability has become important. Moreover, the slope and dumping areas are stable hazards for mining operations. Because of stability risks, waste dumps must be carefully designed. However, systematic studies on dumping area stability are limited, and large-scale landslides continue to occur in dumping areas [
To clarify the formation mechanism of dumping piles on dumping area stability, an investigation in open pit mine and experiments with gravel were conducted. In the Heidaigou open pit mine, the geology overview, dumping operation, waste particle distribution, problems were investigated. In the laboratory, a series of experi- ments were conducted to simulate the formation process of single dumping pile, and multiple dumping piles, and the efficiency of dumping operation design.
Field investigations are useful to govern dumping sites [
The studied open pit mine on the Erdos Plateau is relatively high in the northwest and low in the southwest; the maximum and minimum elevations are 1365.5 and 870 m, respectively. The height difference is 595.5 m. Gen-
Representative Mines | Design capability (Mt/a) | First production year | Open pits |
---|---|---|---|
Antaibao | 22 | 1987 | 3 |
Huolinhe | 8 | 1992 | 2 |
Yiminhe | 5 | 1998 | 3 |
Yuanbaoshan | 10 | 1989 | 2 |
Shengli-1 | 20 | 2007 | 5 |
Xiaolongtan | 4.8 | 1995 | 2 |
Hongshaquanbei | 3 | 2010 | ≥7 |
Baiyinhua-1 | 15 | 2005 | 4 |
Hedaigou | 23 | 1999 | 2 |
Year | Production (billion tons) | Year | Production (billion tons) |
---|---|---|---|
2003 | 1.72 | 2007 | 2.53 |
2004 | 1.99 | 2008 | 2.80 |
2005 | 2.20 | 2009 | 2.97 |
2006 | 2.37 | 2010 | 3.24 |
erally, the elevation ranges from 1100 m to 1300 m.
The annual precipitation ranges from 231 to 634.7 mm. The annual average precipitation is 408 mm. The annual evaporation ranges between 1324.7 and 2896.1 mm, with an annual average of approximately 2100 mm. The climate is arid around the open pit mine. The coal seam floor elevation is higher than the Yellow River water table elevation. There are two primary drainage mechanisms. One way is through natural infiltration, and the other is natural evaporation. The water has a small effect on the dumping stability in the Heidaigou open pit mine.
The limiting strike length for mining is 7.8 km. The average mine width at the bottom is 5.09 km; the area is 40.25 km2, and the average depth is 150 m.
The Heidaigou open pit mine utilizes three dumping operation types. These operations include bucket wheel excavator-belt-stacker dumping, shovel-truck-bulldozer dumping, and dragline dumping operation.
Loess is present at the top of the overburden. The bucket wheel excavator-belt-stacker dumping operation (Fig- ure 3) is used to remove the overburden. In these dumping benches, the waste is primarily loess and contains only small amounts of rock. The particle size distribution is very small and uniform. The waste soils are dumped from the stacker to the slope top, which then roll along the bench slope. Bulldozers adjust the bench top.
Various rocks are found in the middle of the overburden. The shovel-truck-bulldozer (
Sample name | Density (Kg/m3) | Angle of internal friction (degree) | Cohesion (KPa) |
---|---|---|---|
Loess | 1950 | 29.5 | 45.1 |
Mudstone | 2440 | 30.0 | 1275.3 |
Sandy mudstone | 2450 | 30.0 | 2256.3 |
Packsand | 2450 | 31.0 | 3237.3 |
Medium sandstone | 2270 | 31.5 | 2452.5 |
Gritstone | 2240 | 32.0 | 1760 |
Contain gravel gritstone | 2260 | 33.0 | 3924 |
Coal | 1400 | 35.0 | 1851 |
At the overburden bottom, dragline dumping (
Parameters | Unit | Value | Parameters | Unit | Value |
---|---|---|---|---|---|
Bench height | Meter | 18 | Minimum bench working width | Meter | 120 |
Dumping height | Meter | 20 | Final slope angle of slope | Degree | 20 |
Dumping width | Meter | 40 | Factor of loose | 1.15 |
Parameters | Unit | Value | Parameters | Unit | Value |
---|---|---|---|---|---|
Bench height | Meter | 35 | Final slope angle | Degree | 20 |
Rock roll distance | Meter | 18 | Minimum working width | Meter | 90 - 95 |
Repose angle | Degree | 35 - 38 | Factor of loose | 1.2 |
We selected 7 pictures from separate benches in the shovel-truck-bulldozer and dragline dumping areas. The waste particle size distribution is analyzed with Spilt-Desktop Version 2.0 software.
The dumping area problems in the Heidaigou open pit mine are as follows.
1) For excavator-belt-stacker dumping, the operation efficiency is low.
Parameters | Unit | Value | Parameters | Unit | Value |
---|---|---|---|---|---|
Average bench height | Meter | 60.8 | Coal bench angle | Degree | 75 |
Bench height | Meter | 72.5 | Dumping pile angle | Degree | 38 |
Bench width | Meter | 80 | Blasted stockpile settlement height | Meter | 13.5 |
Average dumping pile height | Meter | 60.8 | Blasted stockpile height | Meter | 31.5 |
Factor of loose | 1.35 | Efficiency throwing coefficient | Percent | 25 | |
Coal bench height | Meter | 30 | Coal road width | Meter | 30 |
Rock bench angle | Degree | 65 |
Material No. | P20 (mm) | P50 (mm) | P80 (mm) | Top size (mm) |
---|---|---|---|---|
1 | 88.7 | 177.1 | 362.1 | 642.4 |
2 | 109.9 | 199.2 | 300.0 | 524.4 |
3 | 151.4 | 264.7 | 393.9 | 577.9 |
4 | 91.4 | 146.7 | 293.2 | 565.5 |
5 | 143.1 | 274.0 | 539.8 | 845.4 |
6 | 186.0 | 302.9 | 482.1 | 800.6 |
7 | 114.7 | 215.0 | 368.0 | 664.7 |
Average | 126.5 | 225.7 | 391.3 | 660.1 |
Note: P20―Corresponds to the size in which 20% of the total mass is represented by smaller particles. P50―Corresponds to the size in which 50% of the total mass is represented by smaller particles. P80―Corresponds to the size in which 80% of the total mass is represented by smaller particles.
2) For shovel-truck-bulldozer dumping, the principal waste is loess in the Yinwan external dumping area. The dumping area is next to a reservoir with extensive subsidence. Therefore, large trucks cannot work in this area (
3) For dragline dumping, the bench height is 75 m. Small landslides occur frequently and affect the safety of workers and equipment (
Experimental tests are useful to prove and verify theories [
The experimental procedures are as follows.
1) Select a group of samples that correspond to a particle size range with a sieve;
2) Measure a constant volume sample with a graduated cylinder;
3) Place the constant volume samples into the bucket;
4) Set the dumping height and floor angle;
5) Start the crane and dump them on the floor with a constant initial velocity;
6) Measure the pile height, length, width, and angle;
7) Repeat 2) through 6) 5 times. Record data and calculate averages.
At first, the effects of particle size, dumping height and drop volume on the formation of single dumping pile were discussed. Secondly, multiple dumping piles are formed and then the interaction between adjacent dumping piles was discussed under different interval distances. In order to eliminate the effect of water contents of
samples, all samples are dried before the test. Gravel and coarse sand were used in this test as the waste materials. Scale factor was set as 80 based on the results of field investigations and the condition of laboratory test. The average values of P20, P50, and P80 are converted to 1.58 mm, 2.82 mm, and 4.89 mm, respectively. According to the opening of standard sieve, the particle sizes of samples are set from 1.00 - 1.68 mm, 1.68 - 2.83 mm and 2.83 - 4.75 mm. A certain volume of a sample was dropped from a certain height to the floor and then the dimension of the pile was measured. A felt mat was laid on the floor in order to maintain the frictional force between dumping pile/waste materials and floor constant. In this device, drop volume, drop height, drop rate and floor angle can be controlled.
At first, effects of a particle size, a drop height, a drop volume, and a dip of foundation on the formation of single dumping pile are discussed.
The relationship between the pile height/slope angle of dumping pile and the drop height under different particle sizes of waste materials are shown in
They also show that the higher the drop height is, the lower the dumping pile height is and the smaller the slope angle is. The velocity of dropping material when it reaches at the top of the pile increases with the increase of drop height. As a kinetic force of friction is fixed, dropping material rolled the slope faster and reached farther away. Moreover, as their impact force also increases with the increase of drop height, waste material was compacted and the bench height was decreased.
From the above results, it can be concluded that both particle size and dropping height have an obvious impact on the formation of dumping pile.
Based on above laboratory tests and site investigation, the following conclusions were found:
1) The design of blasting can be changed to make the particle size of waste smaller. In the dumping area, the dumping pile repose angle decreases and the roll distance of rock increase as the particle size of the waste in-
crease. As the dumping pile repose angle decreases, the capacity of dumping pile and dumping area stability decreases. Moreover, as the roll distance of rock increases, the safety distance by rock roll increases.
2) The capacity of dumping pile is maximized and the safety distance by rock roll is minimized in the bucket wheel excavator-belt-stacker dumping operation. The value of shovel-truck dumping operation is in the mid- level. The capacity of dumping pile is minimized and the safety distance by rock roll is maximized in the dragline dumping operation.
The relationship between the pile height/slope angle and the drop volume of sample are shown in
It can be seen from this figure that the pile height increases with increasing the drop volume. However, there are no obvious changes on the slope angle and the bench shape due to the change of drop volume.
Hence, it can be said that a drop volume do not have an obvious impact on the shape of dumping pile.
Based on the above laboratory tests and site investigation, the following measures were found:
1) In the selection process of dumping area, the smaller the floor inclination, the better. The dumping pile height decreases and dumping pile length increase as floor inclination increases. Moreover, as the floor inclination increases, the capacity of dumping pile decrease and the roll distance of rock increase.
2) Some measures should be taken to increase the kinetic force of friction between waste material and floor surface. The kinetic force of friction between waste material and floor surface is no more than the kinetic force of friction between waste material and waste material. It is easy to be a weak seam. Generally the inclined floor is flat and an entirety surface, it is easy to be a slide surface. For instance, in the treatment process of floor, we can remove the loose earth and all vegetation to make the floor strong seam. Some pits can be formed in the floor’s surface with blasting method to make the floor not easy to be a slide surface.
Next, the formations of multiple dumping piles were investigated under different conditions.
Dip of foundation (degree) | Pile height | Angle of repose 1 | Angle of repose 2 | Pile length | Pile width |
---|---|---|---|---|---|
(mm) | (degree) | (degree) | (mm) | (mm) | |
20 | 32 | 37 | 21 | 155 | 145 |
15 | 37 | 39 | 23 | 145 | 145 |
10 | 40 | 40 | 30 | 140 | 140 |
5 | 41 | 40 | 32 | 140 | 145 |
0 | 40.5 | 38 | 36 | 143 | 153 |
Based on the above laboratory tests and site investigation, the following conclusion was found. The dumping width should be decided through optimization efficiency of bulldozer and dumping device in bucket wheel excavator-belt-stacker dumping operation and dragline dumping operation. The interaction decreases as the dumping width increases. The work amount of bulldozer increases as the interaction decreases. Efficiency of dumping device decreases as dumping width decreases in bucket wheel excavator-belt-stacker dumping operation and dragline dumping operation.
In the dumping operation, the volume of bucket does not have a pronounced interaction effect on dumping operation. The pile height increases and the minimum interval distance increases as dumping volume increases. Meanwhile, the ratio of dumping volume to dumping pile volume is too small.
From the above discussions, it can be concluded that in the dumping operation the work amount of bulldozer decreases as dumping pile increases. The pile height decreases and interaction effect increases as dumping height increases. Meanwhile, the work amount of bulldozer decreases as interaction effect increases.
Land reclaiming must be carried out after dumping work.
At first, we measure the elevation difference of the fifth dumping pile.
Second, the volume of each pile was changed to examine the relationship between pile numbers and amount of grading under the condition of constant total volume and constant floor area. An example of the results is shows that in
Second, the volume of each pile was changed to examine the relationship between pile numbers and amount of grading under the condition of constant total volume and constant floor area. An example of the results is shows that in
However, different equipment has different efficiency, different flexibility, and bucket volume. Equipment will decide the dumping volume, cost, the work time of building the dumping pile and stripping work. Therefore, the design of the dumping operation must consider the total efficiency of ground leveling operation and forming dumping area.
In this study, a site investigation and a series of experiments were performed to determine the formation mechanisms of dumping piles and slope stability. The following conclusions were found:
Total volume V0 (cm3) | 1200 | |||
---|---|---|---|---|
Pile numbers | 6 | 4 | 2 | 1 |
Floor area A (cm2) | 570 | |||
Amount of grading ΔV (cm3) | 81.53 | 160.8 | 197.6 | 461.1 |
Based on site investigations at the Heidaigou open pit mine, different dumping operations have different operational and geotechnical issues. In the bucket wheel excavator-belt-stacker dumping area, the operation efficiency is low. Moreover, in the shovel-truck-bulldozer dominant loess dumping area, substantial subsidence exists. Large trucks cannot work in this area. In the dragline dumping area, the bench height is high; small land- slides occur frequently, affecting the safety of staff and equipment.
The design of blasting can be changed to make the particle size of waste smaller. In the dumping area, the capacity of dumping pile decreases and safety distance by rock roll increase as the particle size of the waste increases. The capacity of dumping pile is maximized and the safety distance by rock roll is minimized in the buc- ket wheel excavator-belt-stacker dumping operation. The value of shovel-truck dumping operation is in the mid- level. The capacity of dumping pile is minimized and the safety distance by rock roll is maximized in the dragline dumping operation. The volume of bucket does not have a pronounced effect on dumping pile repose angle, capacity of dumping pile, and dumping area stability. In the selection process of dumping area, the smaller the floor inclination, the better it is. Two methods are proposed to increase the stability of dumping areas. First, the loose earth and all vegetation can be removed to make the floor strong seam. Second, floor surface of dumping area becomes rough by blasting, which can prevent the floor from being slide surface.
The dumping width should be decided through optimization efficiency of bulldozer and dumping device in bucket wheel excavator-belt-stacker dumping operation and dragline dumping operation. In the dumping operation, the volume of bucket does not have a pronounced interaction effect on dumping operation. In the dumping operation, the work amount of bulldozer decreases as dumping pile increases. The design of the dumping operation must consider the total efficiency of ground leveling operation work and forming dumping area work.
The authors wish to express appreciation for the assistance and cooperation given by the G-COE.