We study a firm that has a conventional plant and considers introducing a new plant as an alternative to generate electricity. The firm’s decision includes the optimal entry time for the new plant, and the optimal dispatch between the existing plant and the new plant after it has been constructed to maximize the expected profit over an infinite time horizon. Under geometric Brownian motion, we formulate the problems as non-regular mixed optimal stopping/control problem. Due to the intractability of the mixed problem, we decompose it into two auxiliary problems, and characterize the optimal strategies in closed-form by standard value-matching and smooth-pasting conditions. Our numerical example confirms our theoretical results.
Climate change is now recognized as the major environmental problem facing the world. The factor of most concern that causes climate change is the increase in carbon dioxide levels due to emissions from fossil fuel combustion. Therefore, construction of an alternative power plant is crucial to reducing carbon dioxide emission. By introducing an alternative plant, the firm therefore has an energy portfolio. A decision on when a new plant should be built must consider this uncertainty due to fluctuations in electricity prices. We study this problem with the optimal entry decision for the new plant, given fixed capital investment and the optimal dispatch decision for the conventional plant and the alternative plant with the objective of maximizing the long-term expected profit under geometric Brownian motion for the electricity prices over an infinite horizon.
Investments in and operations of power plants have been widely studied. Deng et al. [
This paper studies the timing that a firm invests in a new technology. We assume the firm owns a plant, and considers adding a new plant while maximizing the expected long-term profit. Since the firm can generate electricity by a portfolio of two plants, the optimal dispatch of these two plants needs to be determined after the new plant is constructed. (Admittedly, it is possible to include more plants with various generating methods; we discuss this extension in Section 5. Under the geometric Brownian motion of long-term electricity prices [
Our contribution is two-fold: First, we formulate the problem as a mixed stochastic control problem. Therefore, the optimal entry decision and optimal dispatch are addressed accordingly. To the best of our knowledge, the mixed control problem cannot be solved directly. Second, we decompose the intractable mixed problem into two auxiliary problems, and the corresponding value functions satisfy a standard Hamilton-Jacobi-Bellman (HJB) equation or variational inequality (VI). We obtain the closed-form solutions to the value functions.
The rest of the paper is organized as follows. We formulate the decision problem as a non-standard stochastic control problem in Section 2. In Section 3, we write the equivalent form of the value function to the control problem. By standard arguments, we obtain the closedform of the value function. In Section 4, we provide a numerical example to confirm our results and sensitivity analysis. Finally, conclusions and future research directions are presented in Section 5.
We introduce the following notation to formulate the problem.
• : Electricity price [$/MWh]
• : the risk-adjusted discount rate
• : maximum proportion of total wealth invested in alternative method (AL)
• : proportion of total wealth invested in AL [Decision variable]
• : Production rate of the conventional method (CON)
• : Production rate of AL
• : Total cost of generating units of electricity from CON
• : Total cost of generating units of electricity from AL
• : time to construct AL [Decision variable]
• : capital investment for constructing AL [\$]
We assume the long-term electricity price follows the standard geometric Brownian motion [
where μ and σ are expected growth rate and volatility of the electricity price respectively, and {Bt} is a Wiener processes. Assume x is the initial position of electricity price. That is, X0 = x.
The objective of the firm is to choose an optimal stopping time τ to construct AL, and an optimal proportion α after τ in order to maximize the expected profit. If we define the expected discounted profit functional J given initial electricity price x, proportional investment in AL α, and the time to construct AL τ as
subject to (1), where Ex is the expectation with respect to x and αt is obviously a function of time t, then the value function u is defined as
where Γ is the set of stopping times.
In order to solve the non-standard stochastic control problem (3), we proceed as follows: By introducing an auxiliary function x, we obtain the equivalent function w to the value function u, which solves an optimal stopping problem. We then get the closed-form solution of w by value-matching and smooth-pasting conditions.
We define the auxiliary function v as the expected profit from the portfolio assuming AL is constructed:
It is easy to get
by the fact that, where
If we define the value function w as
we can formally prove that w is equivalent to u in (3) (See [
The value function w satisfies the combination of variational inequality of optimal stopping problem as follows
where the generator L is defined as
First we consider the solution to the following ordinary differential equation (ODE):
A special solution to (10) can be easily identified as
If we try a function w of the form
, for some constant β, (12)
we get
where
Note that
Therefore if we assume, then we can get there exists such that
Next we solve for the explicit form of solution to Problem (7). With the value of, we put
for constants C and to be determined.
By value matching condition [
and smooth pasting condition [
It is easy to see that
and
(20) requires that
Therefore we obtain
(20) also requires that
Plugging (22) into (20) yields
In summary, the value function u is equivalent to w, which has the closed-form (16). The unknown constants are determined by (22) and (24) with constraints (23).
A numerical example with the following parameters
The results are as follows
They indicate that when electricity price is higher than 91.97, it is optimal to construct the alternative plant. Otherwise, the decision-maker needs to keep the conventional method.
Next we carry about sensitivity analysis by changing one of the given parameters to see how it affects the threshold level as in (22).
First we change the capital investment K from $400 to $600 with other parameters fixed.
Second, if the electricity price growth rate μ changes from 1% to 3% with other parameters fixed, then the threshold level decreases from $84.38 to $77.47 as shown in
Third, if the electricity price volatility σ changes from 10% to 200% with other parameters fixed, then the threshold level increases drastically from $84.38 to $2372.1 as shown in
We omit the sensitivity analysis with other parameters as it is straightforward to carry out given (22).
We study the optimal entry decision for alternative plant given a fixed capital investment, and the optimal dispatch decision between the conventional plant and the alternative plant. By introducing two auxiliary problems, we solved the mixed stochastic control problem in closed form.
This paper can be generalized in the following ways. First, the analysis in this paper is just based on one stochastic process (the electricity price); we admit that there are other stochastic processes that can affect the decisions, such as the cost of the carbon dioxide emission. We would have more stochastic processes in addition to electricity prices process, and we need to solve the multidimensional optimal control problem. Second, switching costs will be incurred when we abandon the conventional method, and singular control technique would be employed to study this problem.