L. Fu
timely, and effectively through the fast, real-time and accurate flow of the information in the logistics system.
Therefore, the relief supplies can be delivered to disaster areas rapidly and ensure the normal life of people.
The third measure shows that a supporting and decision-making role of the logistics information system. It
can assist the power companies to collect information and predict accur ately the disaster in the future, which can
effectively control disaster losses.
The fourth measure is to strengthen the response to emergencies. For instance, increasing reserve power of
emergency and the appliance of GPS and VOIP. In addition, it is necessary to storage some materials such as
grain, coal and so on. For those disaster areas of grid damaged, local government can utilize the coal to generate
the power and stabilize the emotions of people.
1.2. The Shortages of Recovery and Reconstruction of Jiangxi Power Grid Mainly
Demonstrate in the Following Aspects
The first shortage lies in the predictable capability for the disaster. For example, local government should con-
struct a comprehensive and systematic infrastructure before the large natural disasters happened rather than re-
gret it later. Thus, it is necessary to improve the capability of resisting disaster.
The second one is the immaturity emergency response system and mechanism. In order to improve the abili-
ties of handling emergencies, the power grid of China should strengthen the construction of the emergency re-
sponse system. It can assist relative department to achieve a rapid respo nse rather than waiting for approval from
superiors .
The third one is the lack of the research on the features and patterns of natural disasters under the modern
conditions and the capacity of disaster prevention and reduction. It is unbelievable that the storm left such chaos
under advanced science and the early warning system. Therefore, this means the issues existed in the whole sys-
tem.
The fourth one is in the repairing and examining work of power grid for a long term. For instance, the trouble
wire should be found quickly and changed into the new one instead of waiting for remedy of the issue.
The fifth one is short of the innovation or import of advanced technology, such as the research on the tech-
nology of ice melting and anti icing. Government also should improve the level of disaster prevention and allev-
iation and the foundation of scientific decision-making. The National Disaster Reduction centre as a basis estab-
lished a shared platform of disaster information and information exchange services between departments. This
can achieve an improvement of the information sharing mechanism.
The last one is the insufficiency in the overall planning of emergency resources and centralized management,
with particular attention to the linkage and training of the social emergency system. In order to improve the ca-
pability of the management efficiency and dealing with emergency, it is time to establish and lift the standards
of the emergency and repairing work, quantize disaster grade.
The State Power Corporation of China has been issued “An emergency treatment counter plan about the pow-
er equipment of Jiangxi Province Electric Power Company in wide range damage” on 21st June 2006. The main
purpose of the plan is to handle and control a large fan power facilities surrounding damage accurately and
timely. Meanwhile, the plan also is to minimize and eliminate the impact and losses of the accident, ensure
safety in production of the grid and maintain the electricity supply of the society. However, the content of the
plan is the principle provisions and lack of the implementation capacity of provisions. Thus, it is necessary to
formulate specific measures when the emergency material cannot be timely supplied by the province [2].
These measures involve in the following aspects. First of all, the department of material assurance could rush
to the China State Grid Corp Bidding Center for a support. Then the Center could collect the inventory survey of
other provinces’ electric power company and pole manufactures and provides the information to the material
assurance department of anti ice rescue in Jiangxi Province. Secondly, Central China Power Supplies Company
should play a role of regional advantages and keep close to the engineering department and technology depart-
ment. Meanwhile, the company also should maintain a communication with those key manufacturers who
mainly produce the facilities and components of accident repair. This can ensure the disaster relief supplies and
relevant personnel in disaster area timely and accurately. Overall, Jiangxi Province Electric Power Company
should prearrange the relief materials and equipments, keep contact with the preferred and alternative suppliers,
and power grid supply department of other provinces to ensure the scheduling purchase and distribution of ur-